
RESTORING CARRIAGE RAILS
TO OPTIMUM SAWING EFFICIENCY
A Cost Saving Alternative to Rail Replacement
Most sawmills use the highest degree of accuracy possible when initially installing headrig carriage rails.However, over time the carriage rails become worn and/or misaligned.
We consistently find V-rail misalignment up to .100 and flat tail wear in front of the saw and slabber of .250+. Ninety percent of the rails we check can be brought back to initial trueness.
This is a proven process and is done at a fraction of the cost of rail replacement with equal or greater results.
WORK IS SCHEDULED SO THERE IS NO DOWNTIME OR LOSS OF PRODUCTION FOR YOUR MILL
Acculine Rails PO Box 1586, Corvallis, OR 97339 Phone: 541.745.6420, Cell: 541.760.7173, Fax: 541.745.6820 Email:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
, General Inquiry Form |
|